Manufacturing

Built and tested in-house.

Every batch follows the same stages, with checks at each one.

Factory overview
  1. Raw materialRaw materialVirgin PVC compound is inspected and tested before use.
  2. ExtrusionExtrusionPipe is extruded to the required diameter and wall thickness.
  3. Cutting and bellingCutting and bellingPipes are cut to length and socketed for easy joining.
  4. Testing and dispatchTesting and dispatchImpact, crush and dimension checks before packing.

Quality checks

Add your real test list and certificates here.

Dimension and wall thickness

Measured on samples from every batch.

Impact and crush resistance

Pipes are tested to confirm they hold up on site.

Flame retardance

Compound is checked for flame retardant behaviour.

Certifications

Add BIS or ISI licence details here.

Need a price for your project?

Send us the sizes and quantity and we will reply with a quote.

Request a quote